This module has been specifically developed to process travertine in the “Uno 1T” configuration. Its mission is to dry the slabs before sending them to resin filling. It consists of a long, thermally insulated tunnel with internal temperatures ranging from 45°C to 60°C. The transit time varies from 25 to 30 minutes depending on the runnel length.